
Parley Dormers
A client in Parley wanted their dormer to have a zinc-coloured finish to match the rest of the home, at the most cost-efficient price possible.
A Zinc Look Without the Zinc Cost
The client wanted us to fit a membrane on their dormer so that it would match the rest of their home, with a zinc-coloured finish to blend with the surrounding tiles, completed as cost-efficiently as possible.
Cost was the main challenge. Zinc is an expensive material, so we needed a suitable high-quality alternative. We also had to make sure the dormer looked right for the client while keeping its structural integrity.


The Same Look, for Less
We gave the client a cheaper alternative with the same look for a fraction of the price, using a slate grey membrane with standing seam profiles attached to the timber surrounding the dormer.
We also formed metal capping, fixed to the timber, to keep the membrane waterproof. The client was fully satisfied with the finished dormer.
Get a Free QuoteOn Site in Parley
Get a Free Quote
Unit 5, Wessex Trade Centre
Ringwood Rd, Poole, BH12 3PF


